Files
govoplan/docs/README.md
T
zemion 3ca068f76a
Dependency Audit / dependency-audit (push) Failing after 1m47s
Deployment Installer / deployment-installer (push) Successful in 6s
Security Audit / security-audit (push) Successful in 11m18s
Developer Meta-package Release / publish-package (push) Successful in 11s
Release v0.1.16
2026-08-05 19:52:32 +02:00

76 lines
4.4 KiB
Markdown

# GovOPlaN Documentation Map
This directory contains cross-repository product, architecture, release, and
operational documentation. The map below defines which document answers which
question. A document not listed as the current status source must not present
volatile repository, issue, release, or maturity counts as current facts.
## Strategy
| Question | Canonical source |
| --- | --- |
| What are the stable ideas and boundaries of the platform? | [Platform Core Ideas](PLATFORM_CORE_IDEAS.md) |
| What product outcomes should GovOPlaN pursue? | [Connected Governance Platform Roadmap](CONNECTED_GOVERNANCE_PLATFORM_ROADMAP.md) |
| Which institutional concepts and owners form the target architecture? | [Institutional Governance Target Architecture](INSTITUTIONAL_GOVERNANCE_TARGET_ARCHITECTURE.md) |
| Which end-to-end proofs should guide implementation? | [Reference Journey Program](REFERENCE_JOURNEY_PROGRAM.md) |
| What is the reconciled state now? | [Strategy Status](STRATEGY_STATUS.md) |
The dated [Strategic Review](STRATEGIC_REVIEW_2026-08-05.md) explains why the
current reset and sequencing were chosen. It is an assessment record, not a
second live status page.
## Product Architecture
| Topic | Canonical source |
| --- | --- |
| Product-facing experience and hiding technical module boundaries | [Product Experience and Module Boundaries](PRODUCT_EXPERIENCE_AND_MODULE_BOUNDARIES.md) |
| Federation between autonomous installations | [Federated GovOPlaN Architecture](FEDERATED_GOVOPLAN_ARCHITECTURE.md) |
| Institutional digital twin and continuous assurance | [Institutional Digital Twin](INSTITUTIONAL_DIGITAL_TWIN.md) |
| Assisted and non-digital channels | [Assisted and Non-Digital Channels](ASSISTED_AND_NON_DIGITAL_CHANNELS.md) |
| Cross-module temporal, purpose, retention, and institutional-context adoption | `govoplan-core/docs/INFORMATION_GOVERNANCE_ADOPTION.md` |
| eAkte and digital-record ownership | `govoplan-records/docs/EAKTE_ARCHITECTURE.md` |
| Data source, definition, and transformation graph | [Datasource and Definition Graph Architecture](DATASOURCE_AND_DEFINITION_GRAPH_ARCHITECTURE.md) |
| Focused task views | [Views Architecture](VIEWS_ARCHITECTURE.md) |
| Shared interface patterns | [Interface Pattern Language](INTERFACE_PATTERN_LANGUAGE.md) |
## Runtime And Delivery
- [Module Contracts and Installs](MODULE_CONTRACTS_AND_INSTALLS.md)
- [Platform Control Plane](PLATFORM_CONTROL_PLANE.md)
- [Installation and Deployment Architecture](INSTALLATION_AND_DEPLOYMENT_ARCHITECTURE.md)
- [Kubernetes VM Test Lab](KUBERNETES_TEST_LAB.md)
- [Scaling and Multi-Host Deployment](SCALING_AND_MULTI_HOST_DEPLOYMENT.md)
- [Recovery and Rollback Guarantees](RECOVERY_AND_ROLLBACK_GUARANTEES.md)
- [Recovery Ledger Adoption](RECOVERY_LEDGER_ADOPTION.md)
- [Package Registry Releases](PACKAGE_REGISTRY_RELEASES.md)
## Evidence And Snapshots
These documents are intentionally dated or pinned. They may remain useful even
after the product changes, but they do not override `STRATEGY_STATUS.md`.
- [Capability and Infrastructure Fit Assessment](CAPABILITY_AND_INFRASTRUCTURE_FIT.md), pinned to the 2026-07-22 Campaign composition
- [Strategic Review 2026-08-05](STRATEGIC_REVIEW_2026-08-05.md)
- [Backup and Restore Evidence](BACKUP_AND_RESTORE_EVIDENCE.md)
- [Production Target Handoff](PRODUCTION_TARGET_HANDOFF.md)
- [Target Maturity Evidence Runbook](TARGET_MATURITY_EVIDENCE_RUNBOOK.md)
Machine-readable schemas and evidence files belong beside the document that
defines them. Generated inventories belong in `audit-reports/` and should not
be edited manually.
## Maintenance Rules
1. Gitea issues are the only live work-state source.
2. `STRATEGY_STATUS.md` is the only prose reconciliation of current portfolio
state. Refresh it from manifests, inventories, tests, and Gitea; do not copy
its counts into durable architecture pages.
3. Durable documents state decisions, invariants, ownership, and acceptance
gates. They link to status and issues for implementation depth.
4. Dated assessments retain their original composition and conclusion. Add a
snapshot notice rather than silently updating their claims.
5. Module-specific behavior and user/admin documentation remain in the owning
repository. Meta documentation defines cross-module outcomes and contracts.
6. A new strategy document must replace, narrow, or link an existing source;
it must not introduce a parallel roadmap.